TM-9-2350-311-20-2 Maintenance Manual Volume 2 for M109 Cab Download

Page 344 of 828

TM 9–2350–311–20–2 6–28 6–10 ACCUMULATOR ASSEMBLY (MAIN) This task covers: a. Testing b. Service INITIAL SETUP Tools Artillery and turret mechanic’s tool kit (SC 5180–95–CL–A12) Equipment Condition CAB POWER switch to ON (TM 9–2350–311–10) Vehicle MASTER switch to ON (TM 9–2350–311–10) a. Testing NOTE Testing should be done at a temperature of 60°F to 125°F (15.6°C to 51.7°C) with vehicle on level ground if possible. 1 Check pressure gage (1). Normal range is 925 to 1225 psi (6378 to 8446 kPa). 2 Move traversing lock handle (2) to the LOCKED position or place cannon tube in travel lock. 3 Turn MASTER switch (3) and CAB POWER switch (4) to OFF. 4 Disconnect wire 645 (5) at pressure switch (6) or at quick-disconnect (7) near pressure switch. 5 Turn TRAVERSE CONTROL switch (8) to MANUAL position. 6 Turn MASTER switch (3) and CAB POWER switch (4) to ON. 2 1 9 5 6 7 10 5