TM-9-2350-311-20-2 Maintenance Manual Volume 2 for M109 Cab Download
Page 328 of 828
TM 9–2350–311–20–2 6–12 6–3 POWER PACK, HYDRAULIC (DRAINING, FILLING AND CHARGING) — CONTINUED c. Filling 1 Fill power pack reservoir with hydraulic fluid at power pack gage opening (17) (para 2–9). 2 Check power pack gage (18) for fluid level. Fill to FULL AT 0 PRESSURE mark (19). If power pack reservoir is overfilled, go to step 3. 3 Loosen plug (20) at sight gage (21). 4 Turn pointer handle (22) to DRAIN position. 5 Check fluid level in tube (23) on sight gage (21). When fluid level reaches FULL AT 0 PRESSURE mark (19), turn pointer handle (22) to GAGE position and tighten plug (20). 18 19 23 17 22 21 20 25