TM-9-2350-311-20-2 Maintenance Manual Volume 2 for M109 Cab Download

Page 319 of 828

TM 9–2350–311–20–2 Change 2 6–3 6–1 GAGE ASSEMBLY, SIGHT This task covers: a. Removal b. Disassembly c. Assembly d. Installation INITIAL SETUP Tools Artillery and turret mechanic’s tool kit (SC 5180–95–CL–A12) Utility pail (item 7, Appx H) Materials/Parts Caps and plugs (item 7, Appx D) Lockwasher (item 80, Appx G) Lockwashers (2) (item 79, Appx G) Equipment Condition Discharge hydraulic pressure (para 6–3) Tow cable and cab access cover removed (para 14–11) a. Removal CAUTION All hydraulic lines and ports must be capped to prevent contaminants from entering the hydraulic system and causing internal damage to hydraulic components. NOTE Dispose of hydraulic fluid in accordance with local regulations. 1 Drain hydraulic fluid from sight gage (1) by removing plug (2) and turning pointer handle (3) to DRAIN posi- tion. Drain into utility pail. 1 2 3 M109A4/M109A5 HOWITZER