TM-9-2350-311-20-2 Maintenance Manual Volume 2 for M109 Cab Download

Page 166 of 828

TM 9–2350–311–20–2 Change 2 3–55 yes no D Check nitrogen precharge in secondary accumulator (para 19–6). Is pressure below normal? Charge secondary accumu- lator (para 19–6). Perform leak test (para 6–12). Notify support maintenance. END OF TASK CONTINUED FROM STEP C EQUILIBRATED ELEVATING CYLINDER SECONDARY ACCUMULATOR PRIMARY ACCUMULATOR