TM-9-2350-311-20-1 Maintenance Manual for Volume 1 M109 Hull Download

Page 96 of 1275

TM 9-2350-311-20-1 2-16 PRE-STARTING INSTRUCTIONS — CONTINUED NOTE Location of slave start receptacle differs in M109A2/M109A3 and M109A4/M109A5 Howitzers (para 8-38). NATO slave start cables (6) are used on M109A4/M109A5 and some M109A2 Howitzers. h. Attach slave start cable (6 or 7) securely (8) in both 2-48