TM-9-2350-311-20-1 Maintenance Manual for Volume 1 M109 Hull Download

Page 838 of 1275

TM9-2350-311-20-1 8-80 BATTERY TERMINAL CONNECTOR AND GROUND CABLES This task covers: a. Removal b. Installation INITIAL SETUP Tools General mechanic’s tool kit (item 64, Appx H) Lockwashers (2) (item 77, Appx G) Circuit No. Cable Function: 7 68 a. b. Battery terminal connector Ground cable Removal 1 Remove two battery 2 Remove lugs (2) Installation 1 Install lugs (2) to cables and two battery cables (1) with lugs (2) (para 8-28). from cables (1) by removing nut (3), Iockwasher (4), and bolt (5). cables (1) by installing bolt (5), new Iockwasher (4), and nut (3). 2 Install two battery ground cables and two battery cables (1) with lugs (2) (para 8-28). 8-193 Materials/Parts