TM-9-2350-311-20-1 Maintenance Manual for Volume 1 M109 Hull Download

Page 741 of 1275

TM 9-2350-311-20-1 8-38 SLAVE START RECEPTACLE — CONTINUED b. Installation 1 2 3 4 5 Install ground lead (4), two new Iockwashers (14), and screw (13) to bulkhead. Install insulator (12), new gasket (11 ), and slave start receptacle assembly (10). Install protective cover (9) on receptacle assembly (10). Install four flat washers (7), four new Iockwashers (6), four screws (8), and four nuts (5). Ensure protective cover (9) cord is attached under one screw. Connect ground lead (4) and power lead (3), two new Iockwashers (2), and two screws (1). Wrap exposed wire connections with tape. NOTE FOLLOW-ON MAINTENANCE: Connect batteries (para 8-10) 8-39 EXTERNAL POWER RECEPTACLE (M109A4/M109A5) This task covers: a. Removal b. Installation INITIAL SETUP Applicable Configurations Gasket (item 162, Appx G) M109A4/M109A5 Lockwasher (item 54, Appx G) Lockwasher (item 80, Appx G) TOOIS Lockwasher (item 111, Appx G) General mechanic’s tool kit (item 64, Appx H) Lockwashers (4) (item 87, Appx G) Materials/Parts Equipment Condltlons . . Electrical tape — black (item 62, Appx D) Batteries disconnected (para 8-28) 8-96