TM-9-2350-311-20-1 Maintenance Manual for Volume 1 M109 Hull Download

Page 736 of 1275

TM 9-2350-311-20-1 b. Installation WARNING systems to avoid Ensure MASTER switch is OFF when working on hull electrical shock and burns. 1 Install air cleaner blower relay (M109A2/M109A3) or in-tank fuel pump and generator system relay M109A5) (4). 2 Install three flat washers (3) and three nuts (2). 3 Install electrical connector (1). (M109A4/ 8-36 AIR CLEANER BLOWER RELAY AND AIR CLEANER BLOWER MOTORS This task covers: a. Removal b. Installation INITIAL SETUP Applicable Configurations M109A4/M109A5 Tools General mechanic’s tool kit (item 64, Appx H) Equipment Conditions Portable instrument panel removed (para 8-17) a. Removal WARNING Ensure MASTER switch is OFF when working on hull electrical electrical shock and burns. 1 Disconnect electrical connector (1). 8-91 electrical systems to avoid