TM-9-2350-311-20-1 Maintenance Manual for Volume 1 M109 Hull Download
Page 655 of 1275
TM 9-2350-311-20-1 8-3 VOLTAGE REGULATOR This task covers: a. Removal b. Installation General mechanic’s tool kit (item 64, Appx H) Lockwashers (4) (item 94, Appx G) Lockwashers (4) (item 95, Appx G) Batteries disconnected (para 8-28) a. Removal 1 2 3 4 Disconnect wiring harness connectors (1 and 2) at voltage regulator (3). Remove four screws (4), four flat washers (5), four lockwashers (6), and four nuts (7). Discard lockwashers. Slide mount (8) forward far enough to gain access to voltage regulator Remove four screws (9), four flat washers (10), four Iockwashers (11), lockwashers. NOTE mounting screws (9). and four nuts (12). Discard Step 5 applies to M109A4/M109A5 Howitzers. 5 Remove strap (13). 6 Remove voltage regulator (3). 8-10