TM-9-2350-311-20-1 Maintenance Manual for Volume 1 M109 Hull Download
Page 633 of 1275
TM9-2350-311-20-1 7-7 RADIATOR AND SHROUD (M109A3) — CONTINUED b. Installation — Continued 11 12 13 14 15 16 Install bracket (30), eight flat washers (29), eight new Iockwashers (28), and eight screws (27). Install surge tank-to-pressure relief valve hose (26) and tighten clamp (25). Install aeration detector bracket (23) with detector (24), two washers (22), two new Iockwashers (21), and two screws (20). Install aeration detector-to-engine coolant main tube assembly hose (19) and tighten clamp (18). Install two electrical connectors (16) and ground (17). Install alternator (para 8-2). 7-28