TM-9-2350-311-20-1 Maintenance Manual for Volume 1 M109 Hull Download

Page 551 of 1275

TM 9-2350-311 -20-1 5-16 TURBOCHARGER LINES — CONTINUED b. Installation Ensure engine is cool before removing or installing turbocharger lines to prevent burns or injury. 1 Install oil return line (10) and two clamps (9). 2 Install oil supply line (6) on turbocharger (7) and elbow (8). 3 Install washer (3), screw (4), new Iockwasher (2), and nut (l). 4 Install screw (5). NOTE FOLLOW-ON MAINTENANCE: Install powerplant (para 4-5) 5-30 WARNING