TM-9-2350-311-20-1 Maintenance Manual for Volume 1 M109 Hull Download

Page 509 of 1275

TM 9-2350-311 -20-1 4-5 POWERPLANT — CONTINUED f. Installation — Continued 3 Place coolant surge tank (1 37) on top of 4 “ Position lifting equipment for powerplant 5 Attach lifting sling to powerplant (138) at powerplant (138). (138) installation. four lifting eyes (139). CAUTION Watch all sides of powerplant, making sure it clears hull. Have one person observe from driver’s compartment through engine compartment access to ensure air intake duct isn’t forced into fuel tank, damaging it. 6 Lift and setpowerplant(138) in vehicle hull. 7 Remove lifting sling frompowerplant (138). 4-48