TM-9-2350-311-20-1 Maintenance Manual for Volume 1 M109 Hull Download
Page 486 of 1275
TM 9-2350-311-20-1 Perform visual inspection and check load test date on lifting sling. Never crawl under equipment when performing maintenance unless equipment is securely blocked. Keep clear of equipment when it is being raised or lowered. Do not allow heavy components to swing while suspended by lifting device. Exercise extreme caution when working near a cable or chain under tension. Failure to do so could cause severe injury or death. Use extreme care when removing and installing powerplant to avoid damaging fuel tanks and radiator. 48 Attach lifting sling to power plant (138) at four lifting eyes (139). 49 Lift powerplant (138) out of hull slowly, After lifting powerplant several inches, shift it toward front of vehicle for clearance. Watch all sides of powerplant to ensure clearance during removal. 4-25 WARNING CAUTION