TM-9-2350-311-20-1 Maintenance Manual for Volume 1 M109 Hull Download

Page 459 of 1275

TM 9-2350-311-20-1 CONTINUED FROM STEP B I 1. Disconnect lead 50A from slave start receptacle. 2. Place red lead of multimeter on lead 50A and black lead to ground. 3. Check for continuity. Is continuity present? I I I ground lead (para 8-55). Replace slave start receptacle D 1. Disconnect slave start cable from slave start 2. 3. 4. 5. 6. 7. receptacle of vehicle being slaved. Reconnect lead 50A to slave start receptacle. Disconnect NATO slave start-to-external power wiring harness from driver’s bulkhead. Reconnect slave start cable to vehicle being slaved. Place red lead of multimeter on pin B (lead 49A) and black lead on pin E (lead 50A). Turn MASTER switch to SLAVE and check for voltage. Turn MASTER switch OFF. I Is voltage present? I 1 Repair or replace leads 49A and 50A of NATO slave start-to-external power wiring harness (para 8-63). , CONTINUED ON NEXT PAGE 3-359