TM-9-2350-311-10 M109 Operator's Manual for M109A2, M109A3, M109A4 and M109A5 Download
Page 766 of 775
TM 9-2350-311-10 Subject Paragraph T - Continued Page 3-23 2-103 2-129 1-39 3-5.5 2-10.3 2-10.8 1-14.11 3-4 3-4 3-7.3 3-6.5 3-7.5 3-86 3-50 3-93 Track tension, adjusting . . . . . . . . . . . . . . . . . . . . . Transmission shift control lever . . . . . . . . . . . . . . . Traversing and elevating . . . . . . . . . . . . . . . . . . . . Traversing system, cab . . . . . . . . . . . . . . . . . . . . . Troubleshooting . . . . . . . . . . . . . . . . . . . . . . . . . . . . Trunnions, leveling gun . . . . . . . . . . . . . . . . . . . . . . Tube, estimating remaining round life of cannon. . . . . . . . . . . . . . . Tube, leveling the cannon . . . . . . . . . . . . . . . . . . . U Unloading an M712 projectile . . . . . . . . . . . . . . . . 5-19 Unloading the 155MM cannon . . . . . . . . . . . . . . . . 2-14 Unpacking and inspection . . . . . . . . . . . . . . . . . . . 5-15 Unusual environment/weather, operation in . . . . . . . . . . . . . 5-94 2-233 5-81 2-20 2-272 V Ventilation blower .............................................................. 2-17.3 Verification of scribe lines on the M15 elevation quadrant, field ....................... 3-7.11 Verification using the M145/M145A1 telescope mount check, scribe ................... 3-7.10 W 2-256 3-109 3-107 Warranty information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-7 Weapon, boresighting the . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-7.4 Z 1-3 3-93 Zero pressure check and checking, filling, and draining power pack . . . . . . . . . 3-6.4 3-45 Index 14 Change 2