TM-9-1290-365-24&P Technical and Parts Manual for Paladin Muzzle Velocity System M93 Upgraded Download
Page 83 of 334
ARMY TM 9-1290-365-24&P CHAPTER 4 UNPACKING AND INSTALLATION CHAPTER CONTENTS Subject Page General ......................................................................................................................................... 4-1 Unpacking..................................................................................................................................... 4-1 Installation..................................................................................................................................... 4-1 Installation of Transceiver Assy on Gun ...................................................................................... 4-2 System Interconnection ................................................................................................................ 4-2 4.1 GENERAL. This chapter describes procedures required for proper unpacking and installation of the M93 MVS. 4.2 UNPACKING. a. Open packaging and verify that all parts are present. Refer to Table 1-1 and Figure 1-1. b. Inspect Transceiver Assy and verify: (1) No external mechanical damage to Transceiver housing. (2) No connector pins are bent or broken. (3) Transceiver Assy is properly fastened to Mounting Bracket Assy. If necessary, tighten four screws using 5-mm hex key wrench. c. Inspect cables and verify: (1) No external mechanical damage. (2) No connector pins are bent or broken. NOTE Remember to place dust caps on connectors when not in use. 4.3 INSTALLATION. Refer to Figure 4-1. Installation of the system units is performed in the following steps: a. Install Transceiver Assy with connected Mounting Bracket Assy on non-recoiling part of gun. b. System interconnection. 4-1