TM-9-1290-365-24&P Technical and Parts Manual for Paladin Muzzle Velocity System M93 Upgraded Download
Page 207 of 334
ARMY TM 9-1290-365-24&P Date: _______________________ Tested by: _______________________ Inspected by: _______________________ D.4.12.3 2.3 FUNCTIONAL TEST . D.4.l2.3.1 2.3.1 Functional Test Procedures. The test setup provided in Figure D-11. shows the equipment used and cable hookup for the first procedural step. D.4.12.3.2 Test Data Sheet . The test data sheets in Table D-6., are to be reproduced locally, as required, for recording the test results. The test data sheets must be completed each time a test section is performed. The completed test data sheets shall be retained and used as a troubleshooting aid. D.4.12.3 2.3.3 Preparation for Test. a. Reinstall the RF cable lAW para. D.4.11.7 .7. b. Reconnect connector P4 (26 on Figures D-1, D-2. and D-3.) to the MVP CCA (25 on Figures D-1, D-2. and D-3.). c. Energize power supply and adjust for +28 ± 0.5Vdc. Deenergize power supply. d. Energize and adjust DMM to measure high DC current (10A range). e. Place the test Doppler simulator on the transceiver antenna radome using the handle. D-37