TM-9-1200-215-34&P Technical Manual for M109 Automatic Fire Control System (AFCS) Download
Page 93 of 266
TM 9–1200–215–34&P 3–2 (1) Inspect the equipment for damage incurred during shipment. If the equipment has been damaged, report the damage on SF 364, Report of Discrepancy. (2) Check the equipment against the packing slip to see if the shipment is complete. Report all discrepancies in accordance with the instructions of DA PAM 738–750. c. Processing unpacked equipment. Enter unpacked and checked equipment into normal work schedule based on standard shop practice Section III – PRE–SHOP ANAL YSIS Page Page Introduction 3–2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Pre–shop Analysis 3–2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3–6. INTRODUCTION Pre–shop analysis is a method for screening incoming equipment to determine its physical condition for maintenance tasks required to return the equipment to service. Pre–shop analysis begins with a technical inspection of the equipment and ends with a report of corrective actions taken. Other than for structural malfunctions, such as broken handles, all incoming equipment is subject to manual troubleshooting as outlined in Section IV of this chapter. 3–7. PRE–SHOP ANALYSIS Using T able 3–1 and paragraph 1–1 1 as a guide, check for parts that are broken, cracked, bent, dented, or missing. Evaluate condition of assembly. Verify that all cable receptacles are securely fastened. Acceptable cracks and dents should be cleaned and missing Chemical Agent Resistant Coating (CARC) should be reapplied. WARNING Uncured CARC paint contains hazardous materials. Follow manufacturer’s instruction in preparation and application of the CARC. Failure to comply may result in injury to personnel. Table 3–1. Pre–shop Analysis Guide Item Description Check Action 1 Forms and Tags Existence. Determine reason for sending LRU to maintenance. 2 Receptacle: J1 Cleanliness, corrosion, bent pins, cracks, and broken or worn con- nector lugs. Tighten, clean or forward to depot as appropriate. 3 Switch Panel Cleanliness, broken toggle covers, cracks, cracked/cut environmental key covers, and burnt out LEDs. Clean, evaluate or replace as required. 4 Electrolumines– cent Panel Cleanliness, cracks, fuzzy display. Clean, evaluate or replace as required. 5 Handle Existence, function, and cracks. Replace as required. 6 Enclosure Cleanliness, corrosion, dents, cracks, broken vanes and mount- ing feet, and markings and paint. Condition of inlet valve. Clean, evaluate, spot paint, or forward to depot as appropriate. Replace inlet valve per paragraph 1–24. Change 1