TM-9-1200-215-34&P Technical Manual for M109 Automatic Fire Control System (AFCS) Download
Page 79 of 266
TM 9–1200–215–34&P 2–44 2–23. CONNECTOR P ANEL ASSEMBL Y WITH MAIN CABLE MAINTENANCE INSTRUCTIONS DESCRIPTION This task covers: a. Removal b. Installation INITIAL SETUP Tools: Tool Kits, JTK–17LAL, TK–101/G, or TK–105/G (items 34, 35, & 36, Appendix E) Torque Wrench, 0–75 in.–lb (item 40, Appendix E) Pliers, Wire Twister (item 47, Appendix E) Materiels/Parts: Lockwasher (item 6, Appendix F) Lockwire (item 30, Appendix D) Insulation Sleeving (item 26, Appendix D) Solder (item 28, Appendix D) Soldering Flux (item 18, Appendix D) Alcohol (item 4, Appendix D) Brush, Acid Swabbing (item 11, Appendix D) Preformed Packing (item 12, Appendix F) Preformed Packing (item 13, Appendix F) Equipment Conditions: Unenergized ACU is on workbench Personnel Required: One MOS 35Y a. REMOVAL CAUTION ESD SENSITIVE The ACU contains ESD sensitive components. Wear a protective ESD wrist strap whenever handling components. Failure to comply may result in damage to equipment. CAUTION The connector panel assembly is attached by cables to internal components of ACU and cannot be moved very far from housing without putting strain on those cables. Exercise caution when removing bottom cover from ACU housing. Failure to comply may result in damage to equipment. Change 1