TM-9-1200-215-34&P Technical Manual for M109 Automatic Fire Control System (AFCS) Download

Page 155 of 266

TM 9–1200–215–34&P 6–1 CHAPTER 6. DIRECT SUPPORT MAINTENANCE INSTRUCTIONS FOR POWER CONDITIONING UNIT (PCU) Section I – REP AIR P ARTS, TOOLS, SPECIAL TOOLS, TEST , MEASUREMENT AND DIAGNOSTIC EQUIPMENT (TMDE), AND SUPPORT EQUIPMENT . Page Page Common T ools and Equipment 6–1 . . . . . . . . . . . . . . Special Tools, TMDE, and Support Equipment 6–1 . Repair Parts 6–1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–1. COMMON TOOLS AND EQUIPMENT For authorized common tools and equipment, refer to the Modified Table of Organization and Equipment (MTOE), CTA 50–970, or CTA 8–100, as applicable to your unit. 6–2. SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT Refer to Appendix C, Repair Parts and Special Tools List (RPSTL) for applicable special tools, TMDE, and support equipment. 6–3. REPAIR P ARTS Refer to Appendix F of this manual for a list of mandatory replacement parts. Repair parts are listed and illustrated in Appendix C of this manual. Section II – SERVICE UPON RECEIPT . Page Page Site and Shelter Requirements 6–1 . . . . . . . . . . . . . . Service Upon Receipt of Materiel 6–1 . . . . . . . . . . . . 6–4. SITE AND SHEL TER REQUIREMENTS Power Conditioning Unit DS maintenance will be performed using the facilities contained within the Electronic Shop, Transportable, AN/TSM–191(V)3. 6–5. SERVICE UPON RECEIPT OF MATERIEL a. Unpacking. (1) Place packed Power Conditioning Unit (PCU) on a work bench. (2) Check the condition of the packaged PCU. Check the markings. Note discrepancies. (3) Do not use sharp blades or sharp cutting tools when unpacking the PCU. Remove packing material carefully. b. Check unpacked equipment. (1) Inspect the equipment for damage incurred during shipment. If the equipment has been damaged, report the damage on SF 364, Report of Discrepancy.