TM-9-1200-215-34&P Technical Manual for M109 Automatic Fire Control System (AFCS) Download
Page 115 of 266
TM 9–1200–215–34&P 4–1 CHAPTER 4. DIRECT SUPPORT MAINTENANCE INSTRUCTIONS FOR PROGNOSTIC/DIAGNOSTIC INTERFACE UNIT (PDIU) Section I – REP AIR P ARTS, TOOLS, SPECIAL TOOLS, TEST , MEASUREMENT , AND DIAGNOSTIC EQUIPMENT (TMDE), AND SUPPORT EQUIPMENT . Page Page Common T ools and Equipment 4–1 . . . . . . . . . . . . . . Special Tools, TMDE, and Support Equipment 4–1 . Repair Parts 4–1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4–1. COMMON TOOLS AND EQUIPMENT For authorized common tools and equipment, refer to the Modified Table of Organization and Equipment (MTOE), CTA 50–970, or CTA 8–100, as applicable to your unit. 4–2. SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT Refer to Appendix C, Repair Parts and Special Tools List (RPSTL) for applicable special tools, TMDE, and support equipment. 4–3. REPAIR P ARTS Refer to Appendix F of this manual for a list of mandatory replacement parts. Repair parts are listed and illustrated in Appendix C of this manual. Section II – SERVICE UPON RECEIPT . Page Page Site and Shelter Requirements 4–1 . . . . . . . . . . . . . . Service Upon Receipt 4–1 . . . . . . . . . . . . . . . . . . . . . . 4–4. SITE AND SHEL TER REQUIREMENTS PDIU DS maintenance will be performed using the facilities contained within the Electronic Shop, Transportable, AN/TSM–191(V)3. 4–5. SERVICE UPON RECEIPT OF MATERIEL a. Unpacking. (1) Place packed PDIU on a work bench. (2) Check the condition of the packaged PDIU. Check the markings. Note discrepancies. (3) Do not use sharp blades or sharp cutting tools when unpacking the PDIU. Remove packing material carefully.