TM-9-1200-215-34&P Technical Manual for M109 Automatic Fire Control System (AFCS) Download
Page 113 of 266
TM 9–1200–215–34&P 3–22 3–18. SERIAL CABLE ASSEMBL Y MAINTENANCE INSTRUCTIONS CONTINUED b. INSTALLATION CONTINUED 4. Connect J1 connector (8) to switch panel receptacle (10). Torque two captive connectors screws (9) to 5.5".5 in.–lb (.6".1 NSm). 5. Connect connector A1P4 (5) to EL panel receptacle J4 (6). Torque two captive connector screws (4) to 5.5".5 in.–lb (.6".1 NSm). 6. Connect connector A1P1 (2) to display panel receptacle (3). Torque two captive connector screws (1) to 5.5".5 in.–lb (.6".1 NSm). 7. Install clamp (14), screw (11), flat washer (12), and new lockwasher (13) in DU, securing serial cable assembly . 8. Install switch panel IAW procedure outlined in paragraph 3–15. 10 14 12 13 11 6 3 4 5 1 2 9 8