TM-9-1200-215-34&P Technical Manual for M109 Automatic Fire Control System (AFCS) Download

Page 106 of 266

TM 9–1200–215–34&P 3–15 3–15. SWITCH P ANEL MAINTENANCE INSTRUCTIONS CONTINUED b. INSTALLATION CONTINUED 4. Install cable clamp (10), flat washer (9), new lockwasher (8), and screw (7) on DU–Serial cable assembly . Torque cable clamp screw to 20"4 in.–lb (2.3".5 NSm). 5. Connect connector A2P2 (5) to switch panel receptacle A2J2 (6). Secure connector to switch panel by torquing two screws (4) to 5.5".5 in.–lb (.6".1 NSm). 6. Connect connector A2P1 (2) to switch panel receptacle A2J1 (3). Secure connector to switch panel by torquing two screws (1) to 5.5".5 in.–lb (.6 ".1 NSm). 7. Install DU bottom cover following procedure outlined in paragraph 3–13. 3 4 5 6 8 9 7 10 1 2