TM-9-2320-387-24 HMMWV Direct Support & General Support Maintenance Manual Volume 2 Download
Page 866 of 1555
TM 9-2320-387-24-2 25-26 Change 1 25-9. C-PILLAR PARTITION MAINTENANCE (Cont’d) 2. Remove two locknuts (5), capscrews (1), four washers (2), and isolator mount bushings (3) from two C-pillar partition isolator brackets (4). Discard locknuts (5). 3. Remove two locknuts (7), D-ring washers (6), D-rings (8), capscrews (12), washers (10), isolator bushings (11), C-pillar partition isolator brackets (4), isolator bushings (11), and washers (10) from C-pillar partition (9). Discard locknuts (7). 4. Remove locknut (16), D-ring washer (15), D-ring (14), capscrew (13), and washer (17) from C-pillar partition (9). Discard locknut (16). 5. Remove three locknuts (21), capscrews (18), washers (19), and cable access cover (20) from C-pillar partition (9). Discard locknuts (21). Refer to para. 10-56 for plusnut inspection and replacement. 1. Install cable access cover (20) on C-pillar partition (9) with three washers (19), capscrews (18), and locknuts (21). Tighten locknuts (21) to 10 lb-ft (14 N•m). 2. Install D-ring (14) on C-pillar partition (9) with washer (17), capscrew (13), D-ring washer (15), and locknut (16). Tighten locknut (16) to 35 lb-ft (47 N•m). 3. Install two washers (10) and (2), isolator bushings (11) and (3), and C-pillar partition isolator brackets (4) on C-pillar partition (9) with two isolator bushings (11) and (3), washers (10) and (2), capscrews (12) and (1), D-rings (8), D-ring washers (6), and locknuts (7) and (5). Tighten locknuts (7) and (5) to 35 lb-ft (47 N•m). 4. Install stop bracket (25) on C-pillar partition (9) with washer (30), capscrew (29), and locknut (24). Tighten locknut (24) to 10 lb-ft (14 N•m). 1. Position C-pillar partition (9) and two shims (22) on floor (26) between wheelwells (31). 2. Apply sealing compound to threads of eight capscrews (23), and install two C-pillar partition isolator brackets (4) on wheelwells (31) with eight capscrews (23). Tighten capscrews (23) 10 lb-ft (14 N•m). 3. Apply sealing compound to threads of two capscrews (28), and install C-pillar partition stop bracket (25) on floor (26) with two washers (27) and capscrews (28). Tighten capscrews (28) to 75 lb-in. (8 N•m). 4. Install C-pillar gap bracket (33) on wheelwell (31) with four capscrews (32). d. Installation c. Assembly b.1. Inspection 1 2 4 3 5 6 7 8 9 10 11 10 12 2 3 13 14 9 17 15 16