TM-9-2320-387-24 HMMWV Direct Support & General Support Maintenance Manual Volume 2 Download

Page 859 of 1555

TM 9-2320-387-24-2 Change 1 25-19 25-7. CARGO SHELL MAINTENANCE (Cont'd) Refer to para. 10-56 for plusnut inspection and replacement. 1. Apply adhesive tape to cargo shell (26) and wheelwell (19) mounting surface. 2. Using grease, coat inside surface of support tube (25) that makes contact with outside surface of C-pillar (24). 3. Lift rear of cargo shell (26) slightly while installing cargo shell support tube (25) over C-pillar (24). 4. Align cargo shell seal (27) between cargo shell (26) and wheelwell (19). 5. When cargo shell support tube (25) is installed over C-pillar (24), cargo shell (26) is aligned with wheelwell (19) and lower cargo shell (26). 6. Apply sealing compound to threads of capscrew (16), and install support tube (25) on wheelwell (19) with washer (15) and capscrew (16). 7. Apply sealing compound to threads of socket-head screw (17), and install cargo tiedown (18) on wheelwell (19) and support tube (25) with socket-head screw (17). 8. Apply sealing compound to threads of stud (7), and install two resilient mounts (3), plates (4), sleeve spacer (8), and shim(s) (5), if present, between turret support ring (9) and C-pillar support mount (6) with stud (7), two washers (2) and nuts (1). Tighten nuts (1) to 37 lb-ft (50 N m). 8.1. Apply sealing compound to threads of stud (22), and install two resilient mounts (13), plates (12), and sleeve spacer (23) between C-pillar support mount (14) and roof mount (10) with bracket (11), stud (22), washer (21), and nut (20). Tighten nut (20) to 37 lb-ft (50 N m). c. Installation b. Inspection 24 25 26 27 19