TM-9-2320-387-24 HMMWV Direct Support & General Support Maintenance Manual Volume 2 Download

Page 753 of 1555

TM 9-2320-387-24-2 19-5. TRANSMISSION PREPARATION 1 This taskcovers: a. Disassembly b. Assembly INITIAL SETUP: Tools General mechanic’s tool kit: automotive (Appendix B, Item 1) Special Tool ‘Ibrque adapter,9/1&n. (Appendix B, Item 133) Manual References TM 9-2320-387-24P Equipment Condition Transmission/transfer case assembly removed (para. 19-3). Materials/Parts Six locknuts (Appendix G, Item 172) Anaerobic gasket sealing compound (Appendix C, Item 58) Maintenance Level Direct support a. Disassembly 1. Disconnect two transmission/transfer case cooler lines (5) from transmission (3). 2. Disconnect transmission/transfer case vent line (2) from transmission vent tube (4). 3. Remove six locknuts (1) and transmission (3) from transfer case adapter (7). Discard locknuts (1). 4. Separate transmission (3) from transfer case adapter (7). II 1. Clean old sealer from transfer case adapter (7) and transmission mounting surface (6). 2. Apply anaerobic gasket sealing compound to transmission mounting surface (s). 3. Install transmission (3) on transfer case adapter (7) with six locknuts (1). Using torque adapter, tighten locknuts (1) to 26 lb-R (35 Nom). 4. Connect transmission/transfer vent line (2) to transmission vent tube (4). 5. Connect transmission/transfer case cooler lines (5) to transmission (3). 19-14