TM-9-2320-387-24 HMMWV Direct Support & General Support Maintenance Manual Volume 2 Download

Page 1515 of 1555

TM 9-2320-387-24-2 Change 1 INDEX 19 Floor panel repair, right front: Battery tray and right front floor panel installation. . . . . . 33-13i 33-84 Insert panel and right front floor panel installation. . . . . . 33-13j 33-86 Metal strip A and insert panel assembly . . . . . . . . . . . . . . . . 33-13d 33-74 Metal strip B and insert panel assembly . . . . . . . . . . . . . . . . 33-13e 33-76 Metal strip C and insert panel assembly . . . . . . . . . . . . . . . . 33-13f 33-78 Metal strips fabrication . . . . . . 33-13b 33-70 Right front floor panel and battery tray drilling . . . . . . . . 33-13g 33-80 Right front floor panel and insert panel drilling . . . . . . . . 33-13h 33-82 Right front floor panel removal . 33-13c 33-72 Right front insert panel fabrication . . . . . . . . . . . . . . . 33-13a 33-68 Floor panel repair, right rear: Insert panel and right rear floor panel installation . . . . . . . . . . 33-14k 33-104 Metal strip C and insert panel assembly. . . . . . . . . . . . 33-14g 33-99 Metal strip D and insert panel assembly. . . . . . . . . . . . 33-14i 33-101 Metal strip E and insert panel assembly. . . . . . . . . . . . 33-14h 33-100 Metal strips fabrication . . . . . . 33-14c 33-92 Reinforcement strip A and insert panel assembly . . . . . . 33-14e 33-97 Reinforcement strip B and insert panel assembly . . . . . . 33-14f 33-98 Reinforcement strips fabrication . . . . . . . . . . . . . . . 33-14b 33-90 Right rear floor panel removal . 33-14d 33-94 Right rear floor panel and insert panel drilling . . . . . . . . 33-14j 33-102 Right rear insert panel fabrication . . . . . . . . . . . . . . . 33-14a 33-88 Footman loop and strap: Inspection . . . . . . . . . . . . . . . . . 10-13b 10-22 Installation . . . . . . . . . . . . . . . . 10-13c 10-22 Removal. . . . . . . . . . . . . . . . . . . 10-13a 10-22 Footwell inner armor, passenger side: Inspection . . . . . . . . . . . . . . . . . 25-11a.1 25-30 Installation . . . . . . . . . . . . . . . . 25-11b 25-30 Removal. . . . . . . . . . . . . . . . . . . 25-11a 25-30 Footwell outer armor, passenger side: Inspection . . . . . . . . . . . . . . . . . 25-10a.1 25-28 Installation . . . . . . . . . . . . . . . . 25-10b 25-28 Removal. . . . . . . . . . . . . . . . . . . 25-10a 25-28 Former, A-pillar, assembly: Installation . . . . . . . . . . . . . . . . 10-90b 10-152 Removal. . . . . . . . . . . . . . . . . . . 10-90a 10-152 Forward clutch assembly: Assembly . . . . . . . . . . . . . . . . . . 28-11d 28-44 Cleaning . . . . . . . . . . . . . . . . . . 28-11b 28-42 Disassembly . . . . . . . . . . . . . . . 28-11a 28-42 Inspection . . . . . . . . . . . . . . . . . 28-11c 28-42 Fourth clutch assembly: Assembly . . . . . . . . . . . . . . . . . . 28-12d 28-46 Cleaning . . . . . . . . . . . . . . . . . . 28-12b 28-46 Disassembly . . . . . . . . . . . . . . . 28-12a 28-46 End play measurement. . . . . . . 28-12e 28-47 Inspection . . . . . . . . . . . . . . . . . 28-12c 28-46 Frame: Maintenance task summary (DS) . . . . . . . . . . . . . . . . . . . . . 24-3 24-1 Maintenance task summary (GS) . . . . . . . . . . . . . . . . . . . . . 32-3 32-1 Maintenance task summary (unit) . . . . . . . . . . . . . . . . . . . . 9-1 9-1 Frame extension: Installation . . . . . . . . . . . . . . . . 9-3b 9-3 Removal. . . . . . . . . . . . . . . . . . . 9-3a 9-3 Frame, grille: Installation . . . . . . . . . . . . . . . . 10-16b 10-26 Removal. . . . . . . . . . . . . . . . . . . 10-16a 10-25 Frame inspection and repair: General information . . . . . . . . . 32-4a 32-2 Inspection . . . . . . . . . . . . . . . . . 32-4c 32-4 Powertrain lift sling installation . . . . . . . . . . . . . . . 32-4b 32-3 Powertrain lift sling removal . . 32-4f 32-10 Preparation and materials . . . . 32-4d 32-8 Repair procedures . . . . . . . . . . . 32-4e 32-8 Frame, turret: Installation . . . . . . . . . . . . . . . . 25-4b 25-6 Removal. . . . . . . . . . . . . . . . . . . 25-4a 25-4 Front and rear axles maintenance task summary . . . . . . . . . . . . . . . 6-6 6-12 Front bumper and towing brackets: Installation . . . . . . . . . . . . . . . . 9-2b 9-2 Removal. . . . . . . . . . . . . . . . . . . 9-2a 9-2 Front composite light assembly: Installation . . . . . . . . . . . . . . . . 4-53b 4-90 Removal. . . . . . . . . . . . . . . . . . . 4-53a 4-90 Front composite light lamp: Installation . . . . . . . . . . . . . . . . 4-54b 4-92 Removal. . . . . . . . . . . . . . . . . . . 4-54a 4-92 Front cover oil seal: Installation . . . . . . . . . . . . . . . . 15-13b 15-28 Removal. . . . . . . . . . . . . . . . . . . 15-13a 15-28 INDEX (Cont’d) Para. Page F (Cont’d) Para. Page F (Cont’d)