TM-9-2320-387-24 HMMWV Direct Support & General Support Maintenance Manual Volume 2 Download
Page 110 of 1555
TM 9-2320-387-24-2 1 10-M. BODY REPAIR (Cont’d) (d) Shear lock using a pin punch to drive out pin. (e) Pry out remainder of locking collar. (0 Using a drill slightly smaller than rivet shank, drill almost through rivet head. (g) Pry off rivet head with a pin punch. (h) Tap out rivet shank with a pin punch. 3. RivnutE’lusnut Removal. (a) Drill through rivnut head. (b) Punch out shank. 4. Rivet Hole Drilling. (a> (b> (c) Center-punch all new rivet locations. Center punch mark must be large enough to prevent drill from slipping out of position, yet it must not dent the surface of the material. To prevent denting, place a bucking bar behind material during punching. Make sure drill is the correct size (tables 10-l and lo-21 and point is properly ground. A No. 10 drill is used to install standard 3/16-m. blind rivets. Place drill in center mark for new rivet locations, or align drill with old hole the a few with fingers starting motor. will help that drill not jump of position motor is Table 10-l. Sizes for Shank Rivets. #41 0.0960 #30 0.1285 #21 0.1590 #lO 0.1910 F 0.2570 P 0.3230 W 0.3860 10-Z. Drill for Blind NOMINAL DIAMETER (INCH) OVERSIZE DIAMETER (INCH) RlVET DRILL RIVET DRILL DIAMETER SIZE MINIMUM MAXIMUM DIAMETER SUE MINIMUM MAXIMUM l/8 #30 0.129 0.132 l/8 #27 0.143 ,’ 0.146 5132 #20 0.160 0.164 5132 #16 0.176 0.180 3/16 #lO 0.192 0.196 3116 #5 0.205 0.209 1o-93