TM-9-2320-387-24 HMMWV Direct Support & General Support Maintenance Manual Volume 1 Download
Page 545 of 1205
TM 9-2320-387-24-l  2-46. STEKE-R TEST PROCEDURES (Cont’d)  STARTER SOLENOID VOLTS TEST #70  Description:  This procedure measures the voltage present  at the starter solenoids positive terminal. Test  requires DCA hookup only.  Typical Applications: Control Functions:  Check starter solenoid volts. 01,02, 03, 04,06  Test Procedure:  1. Disconnect fuel solenoid wire 54A to prevent  starting.  2. Set TEST SELECT switch to 70.  3. Press and release TEST button.  4. Crank the engine and observe the displayed  voltage.  Pre-Test Procedures:  Run confidence test.  Possible Error Messages:  None.  2-499