TM-9-2320-387-24 HMMWV Direct Support & General Support Maintenance Manual Volume 1 Download
Page 373 of 1205
TM 9-2320-387-24-l  REFERENCE INFORMATION INSTRUMENTS CIRCUIT  2. Connect the RED lead to positive and the BLACK lead  to negative.  3. Be sure to read the correct scale.  RESISTANCE AND CONTINUITY  04,500 OHMS  STEIICE-R TEST 91  1. Connect RED clip and BLACK clip to the terminations  indicated in the question. RED to the first, BLACK to  the second.  2. Start Test 91, 04.500 Ohms.  3. Displayed reading is in ohms. Less than 5 ohms is  continuity. If the resistance is over 4.500 ohms,  SLUICE-R displays .9.9.9.9.  1:  I-  f  0  II  . .  WARNING  Disconnect negative battery cable  before disconnecting and reconnecting  PCB harness.  WARNING  There is battery voltage at the PC9 at all  times. Failure to disconnect battery  cable will result in damage to equipment  or injury to personnel.  Repair harness (para. 4-80).  It is important to connect the leads as indicated because you  are checking continuity across a diode. The lamp will glow  dimly because you are supplying a small amount of power  through STUICE-R. You may have to shade the lamp with  your hand to see if it glows.  A multimeter may not supply enough power to light the lamp.  In this case, look for a much greater resistance when  measuring with the leads connected in one direction than  when they are connected in reverse.  BATTERY VOLTAGE  MULTIMETER  1. Set the voltmeter to a DC volts scale of at least 40  volts.  Replace lamp (para. 4-20).  DC VOLTAGE O-45 VOLTS  STE/lCE-R TEST 89  1. Connect RED clip to the indicated test point,  BLACK clip to negative or ground.  2. Start Test 89. DC Volts.  3. Displayed reading is in volts.  54A 458A  CONTROLLER  WAIT-TO-START LAMP  CONllNUlM (RESISTANCE)  MULTIMETER  1. Set the voltmeter to an ohms scale of about  1,000 ohms.  2. Connect the RED and BUCK leads to the  connections stated in the question.  3. Be sure to read the correct scale. Less than 5  ohms indicates continuity. For an open circuit,  the meter should peg full scale (needle all the  way to the left).  2-319