TM-9-2320-362-14&P HMMWV Technical Manual Electrical Environmental System (EES) Download

Page 164 of 353

TM 9-2320-362-14&P 4-18. EES KIT INSTALLATION (Cont’d) b. Tunnel Interior Side Insulation Blanket and Retainer Installation 1. Using new insulation retainer (5) as template, determine location of hole (17) to be drilled near 2 5/8-inch hole (18) in transmission tunnel (16). 2. 3. 4. 5. 6. 7. 8. 9. Using # 21 WARNING When drilling, be sure to wear goggles for eye protection or injury to personnel may occur. Avoid skin contact with paint, primer, remover, and thinner particularly if there are cuts or open wounds on the hand. Failure to do so could result in serious injury. drill bit, drill hole (17) in transmission tunnel (16). Position new insulation blanket (10) in place against cargo floor (4), transmission tunnel (16), and floor (8). Lift up right front cowl insulation (15) and secure new insulation blanket (10) to floor (8) with two screws (14) and one retainer (13). Secure new insulation blanket (10) to floor (8) with two screws (7), and one retainer (6). Install new insulation retainer (5) to transmission tunnel (16) and secure with one screw (1) and and one bolt (9). Secure one retaining clip (11) and one screw (12) to transmission tunnel (16) to hold new insulation retainer (5). against insulation blanket (10). Position retaining rod (2) into sleeve of insulation blanket (10). Secure retaining rod (2) to cargo floor (4) with two screws (3). 4-52