TM-9-2320-280-20 HMMWV Technical Manual Unit Maintenance Volume 3 Download
Page 927 of 1170
TM 9-2320-280-20-3 12-314 Change 1 Section XII. CARGO BARRIER AND NET KIT MAINTENANCE 12-189. CARGO BARRIER AND NET KIT MAINTENANCE TASK SUMMARY TASK PAGE PARA. PROCEDURES NO. 12-190. Cargo Barrier Channel Replacement 12-314 12-191. Antiskid Strip Replacement 12-316 12-190. CARGO BARRIER CHANNEL REPLACEMENT This task covers: a. Removal b. Installation INITIAL SETUP: Applicable Models M1025, M1025A1, M1026, M1026A1 Tools General mechanics’s tool kit: automotive (Appendix B, Item 1) Manual References TM 9-2320-280-10 TM 9-2320-280-24P Equipment Condition Cargo barrier and net removed (TM 9-2320-280-10). a. Removal NOTE Replacement procedure for left and right cargo barrier channels are the same. This procedure covers the left cargo barrier channel. Remove two nuts (2), washers (3), screws (5), and channel (4) from armor plate (6) and wheelhouse (1). b. Installation Install channel (4) on armor plate (6) and wheelhouse (1) with two screws (5), washers (3), and nuts (2).