TM-9-2320-280-20 HMMWV Technical Manual Unit Maintenance Volume 3 Download

Page 64 of 1170

TM 9-2320-280-20-3 10-28. TUNNEL INTERIOR SIDE INSULATION REPLACEMENT This task covers: a. Removal b. Installation INITIAL SETUP: Tools Equipment Condition General mechanic’s tool kit: s Left front cowl insulation removed (para. 10-26). automotive (Appendix B, Item 1) Front floorboard removed (para. 11-154). Manual References TM 9-2320-280-24P NOTE Removal and installation procedures for all tunnel interior side insulation are basically the same. This procedure covers the left front insulation. 1. Remove two screws (4) from retaining rod (5) and cargo floor (6). 2. Remove two screws (2) from retaining rod (3) and cargo floor (6). 3. Remove three screws (1) and retaining rod (8) from tunnel (7) and cargo floor (6). 4. Remove two screws (9) from retaining rod (10) and tunnel (7). 5. Remove two screws (14), retainer (12), and insulation (11) from floor (13). 6. Remove retaining rods (3), (5), and (10) from insulation (11). b. Installation 1. Install retaining rods (10), (3), and (5) on insulation (11). 2. Position insulation (11) into place against floor (13), tunnel (7), and cargo floor (6). 3. Install insulation (11) and retainer (12) on floor (13) with two screws (14). 4. Install retaining rod (10) on tunnel (7) with two screws (9). 5. Install retaining rod (8) on tunnel (7) with three screws (1). 6. Install retaining rod (3) on cargo floor (6) with two screws (2). 7. Install retaining rod (5) on cargo floor (6) with two screws (4). 10-48