25 August 1988 TM 55-2320-280-14  Figure 7-3. Blocking, bracing and tiedown material for standard flatcar.  Table 7-1. Materials Required to Ship HMMWV on Wood-Deck Flatcar  Item Description Approximate  quantity  Lumber ................................... Douglas-fir, or equivalent; straight-grain, free of material de-  fects; Fed Spec MM-L-751c: ...............................................  2 x 4 x 36 in ............................................................................. .  2 x 6 x 26 in ..............................................................................  6 x 8 x 24 in ..............................................................................  12  4  8  Nails ....................................... Common, steel; flathead; bright or cement-coated, table X1-b,  Fed Spec FF-N-105a: .........................................................  12d ...........................................................................................  40d ...........................................................................................  80  64  Wire rope ............................... 6 x 19, IWRC; improved plow steel; preformed, regular-lay; ta-  ble X, Fed Spec RR-W-140C; 1/2-inch ................................  52 feet.  Clamps ................................... Wire rope, U-bolt clamps, saddled, single-grip, steel, Crosby  heavy-duty, or equal; Fed Spec FF-C-450c, 1/2-in. dia..  24  Thimbles ................................ Standard, open-type, 1/2-in. ...................................................... 8  Turnbuckles ............................ Standard type, FSN 5340-01-121-1961, 3/4 x 12 in. .................. 2  Cushioning material. Waterproof paper, burlap, or suitable material ........................... As required.  Come-along............................ Tool, tensioning device, mechanical .......................................... 1  (2) Step 2. Fabricate four tire sidewall blocks in accordance with blocking pattern 89 in figure 7-3.  Place cushioning material between tire and sidewall block and between railcar floor and sidewall block. Follow  the instruction in figure 7-3 for nailing sidewall blocks to railcar.  c. Tiedown of the HMMWVs will be as follows:  NAIL PIECE A TO PIECE B WITH  12d NAILS, THEN NAIL TO CAR  FLOOR THROUGH PIECE B WITH  FIVE 20d NAILS. NAIL THE OTHER  2” X 4” PIECES EACH TO THE  ONE BELOW IN THE SAME  7-4