TM-10-5411-205-13 HMMWV S-250/G Shelter Operator, Unit and Direct Support Download
Page 32 of 127
TM 10-5411-205-13  3-9. General Repair Procedures (cont).  (2)  (b)  (c)  (d)  (e)  (f)  (g)  (h)  (i)  (j)  Drill hole in structure.  Remove all metal chips and remove burrs from drilled holes.  If flush head rivet is being installed, countersink hole using a 100-degree  or 120-degree machine countersink.  Coat all rivet bodies with sealer (Item 28, Appendix D) before installing.  Insert rivet in hole. Make sure sheets are held tightly together before  upsetting or pulling rivet.  Select proper pulling head for rivet being installed and install pulling head  on rivet gun.  Insert stem of rivet into pulling head.  With pulling head parallel to axis of rivet, upset rivet. Exert firm pres-  sure but do not bend or buckle metal sheets. Stem will break off below  rivet head surface. No trimming should be required.  Make sure riveted parts are not loose, rivet does not rotate, and rivet head  is seated tightly against riveted surface. If rivet is loose or improperly  installed, remove it and install a new one.  Removal. (Figure 3-7)  WARNING  Drilling creates metal chips which may enter eyes and cause seri-  ous injury. Eye protection is required.  NOTE  When drilling through rivet head, be careful to avoid enlarging hole  in structure. Keep drill perpendicular to material being drilled and  do not exert excessive pressure on drill, or replacement rivets will  be too loose.  DRILL PRY OFF  THROUGH  HEAD  HEAD  PUSH OUT  SHANK  Figure 3-7. Removing Blind Rivets,  3-15