TB-9-2510-251-13 HMMWV Operator and Field Maintenance, Installation & Parts Add-On-Armor Air Conditioning Download

Page 82 of 624

2-66 TB 9-2510-251-13 2-1.2 Installation of Air Conditioning Kit to M1097A2 with GSIE Add-on-Armor (Cont’d). d. Install Refrigerant Hoses (Cont’d) (12) Connect Compressor. a. Lubricate O-ring and install #8 female 45° or 90° fitting (7) on upper compressor connection. b. Lubricate O-ring and install #12 female 90° fitting (8) on lower compressor connection. c. Ensure hood of vehicle will close and air intake duct can be reinstalled over compressor. d. Trim ends of #8 (9) and #12 (10) hoses to length and connect to fittings. e. Tighten fittings. Figure 2-100. Compressor Connection 8 10 7 9