TB-9-2510-251-13 HMMWV Operator and Field Maintenance, Installation & Parts Add-On-Armor Air Conditioning Download

Page 321 of 624

SECTION I TB 9-2510-251-13 Section I. INTRODUCTION C-1. Scope. This Repair Parts List (RPL) lists and authorizes spares and repair parts; special tools; special Test, Measurement, and Diagnostic Equipment (TMDE), and other special support equipment required for performance of unit and direct support maintenance of the 1-1/4 ton, 4x4, M998, M998A1, M1097, M1097A1, M1097A2, M1025, M1025A1, M1025A2, M1037 series vehicles. It authorizes the requisitioning, issue, and disposition of spares, repair parts and special tools as indicated by the Source, Maintenance and Recoverability (SMR) codes. C-2. General. In addition to Section I, Introduction, RPL is divided into the following sections: a. Section II. Repair Parts List Breakdown. A list of spares and repair parts authorized by this RPL for use in the performance of maintenance. The list also includes parts that must be removed for replacement of the authorized parts. Parts lists are composed of functional groups in ascending alphanumeric sequence, with the parts in each group listed in ascending figure and item number sequence. b. Section III. Special Tools List. No special tools are required. c. Section IV. National Stock Number and Part Number Indexes. A list, in National Item Identification Number (NIIN) sequence, of all national stock numbered items appearing in the listings followed by a list in alphanumeric sequence of all part numbers appearing in the listing. National Stock Numbers (NSN) and part numbers are cross-referenced to each illustration figure and item number appearance. C-3. Explanation of Columns (Section II). a. Item No. (Column (1)). Indicates the number used to identify items called out in the illustration. b. SMR Code (Column (2)). The Source, Maintenance, and Recoverability (SMR) code is a 5-position code containing supply/requisitioning information, maintenance category authorization criteria, and disposition instruction, as shown in the following breakout: Source Maintenance Recoverability Code Code Code 1st two 3rd position: 4th position: 5th position: positions: Who can install, Who can do Who determines How to get an replace, or use complete repair* disposition action item. the item. on the item. on unserviceable items. *Complete maintenance capacity, capability, and authority to perform all corrective maintenance tasks of the “repair” function in a use/user environment in order to restore serviceability to a failed item. C-3