TB-9-2510-251-13 HMMWV Operator and Field Maintenance, Installation & Parts Add-On-Armor Air Conditioning Download

Page 148 of 624

2-132 TB 9-2510-251-13 2-1.4 Installation of Air Conditioning Kit to M1025A2 with GSIE Add-on-Armor (Cont’d). d. Install Refrigerant Hoses (Cont’d) Figure 2-204. Hose Routing (1) Trim grommets (2) to achieve a snug fit around hoses and wire harnesses. (2) Install one grommet (1) in rear most hole from top of hatch. (3) Install two grommets (2) in remaining holes in hatch from underside of hatch. (4) From top of hatch, push six-pin male connector from condenser wire harness through grommet in rear most hole from top of hatch. (5) Pull approximately eight inches of wire harness through grommet. 1 HIDDEN 2 2