TB-9-2510-251-13 HMMWV Operator and Field Maintenance, Installation & Parts Add-On-Armor Air Conditioning Download
Page 116 of 624
2-100 TB 9-2510-251-13 2-1.3 Installation of Air Conditioning Kit to M1025 and M1025A1 with GSIE Add-on-Armor (Cont’d). e. Install Electrical Harnesses Figure 2-149. Routing (1) Compressor. a. Connect clutch wire (RD-2-4160-0, black wire with white stripe) to compressor. b. Route clutch wire over the engine along firewall and through hole in firewall adjacent to dash panel. c. Connect clutch wire to control panel extension (black wire with white stripe). (2) Evaporator. a. Route control panel harness (RD-2-4527-0) to mating connector on evaporator unit harness. b. Connect extension harness (RD-4-5958-0) from drier to evaporator unit harness. c. Connect power and ground harness to evaporator unit harness. d. Route wires along edge of transmission tunnel under driver’s side mat. e. Secure harness to #12 refrigerant hose near top of transmission tunnel. f. Cut notch in mat for hose and reinstall screws attaching mat to transmission tunnel. g. Route wires forward along transmission tunnel, then through grommet and into battery box.