TB-9-2320-280-35-15 HMMWV Technical Bulletin Installation for Retransmission EPLRS Network Manager Download
Page 56 of 168
TB 9-2320-280-35-15 5-32 6 5 5 7 5 4 1 2 8 18-3. Install power amp mounting base MT6353/VRC (2) on multi-net rack (1) with nut strip (8), four capscrews (4) and (7), six lockwashers (5), and two nuts (6). Figure 5-41. ~ 4. CAPSCREW – B1821BH031F075N – QTY. 2 5. LOCKWASHER – MS45904-72 – QTY. 6 6. NUT – 9418892 – QTY. 2 7. CAPSCREW – B1821BH031F125N – QTY. 2 8. NUT STRIP – A3014064-1 – QTY. 1