TB-9-2320-280-35-15 HMMWV Technical Bulletin Installation for Retransmission EPLRS Network Manager Download
Page 119 of 168
5-95 TB 9-2320-280-35-15 1. INC-EPUU CABLE – A3279383-3 – QTY. 1 4. EPLRS POWER CABLE – A3004939 – QTY. 1 Figure 5-110. Section XXXIX. EPLRS CABLES AND NTDR ANTENNA CABLE INSTALLATION NOTE • Loosen tunnel insulation before performing steps 39-1 and 39-2. (Refer to TM 9-2320-280-20.) • SINCGARS model AN/VRC-92F shown. 39-1. Route INC-EPUU cable (1) from integrated rack (3), down through center access hole (2), and under left-side tunnel insulation (5) towards rear of vehicle. 39-2. Route power cable (4) from rear battery box forward and under integrated rack (3) and under left-side tunnel insulation (5) towards rear of vehicle. 39-3. Secure left-side tunnel insulation (5). (Refer to TM 9-2320-280-20.) 1 2 3 4 5 ~ ~ TUNNEL INSULATION