TB-9-2320-280-35-15 HMMWV Technical Bulletin Installation for Retransmission EPLRS Network Manager Download

Page 107 of 168

5-83 TB 9-2320-280-35-15 NOTE DAGR power cable positive lead insulation is ribbed. 35-12. Attach shrink tubing (18) and terminal lugs (16) and (22) to PLGR power cable negative lead (21) and DAGR power cable positive lead (19). (Refer to TM 9-2320-280-20 for terminal connector repair.) 35-13. Attach DAGR power cable positive lead (19) to 24V terminal board (24) located on cab enclosure panel (25) with existing nut (17). 35-14. Attach DAGR power cable negative lead (21) to ground strap (23) located on cab enclosure panel (25) with existing nut (17). 35-15. Coil excess positive and negative power leads, place beneath ground strap, and secure with tiedown strap (20). NOTE Ensure all excess antenna cable is inside cab of vehicle. 35-16. Coil excess antenna cable and store under integrated rack using tiedown strap as necessary. (Refer to figure 5-94.) 35-17. Install right-side tunnel insulation. (Refer to TM 9-2320-280-20.) Figure 5-99. 16. TERMINAL LUG – 7728780 – QTY. 1 18. SHRINK TUBING – MS23053/4-302-0 – QTY. A/R 20. TIEDOWN STRAP – MS3367-1-0 – QTY. A/R 22. TERMINAL LUG – 7728777 – QTY. 1 25 16 17 20 17 21 18 22 23 24 18 19 ~