TB-9-2320-280-35-15 HMMWV Technical Bulletin Installation for Retransmission EPLRS Network Manager Download

Page 101 of 168

5-77 TB 9-2320-280-35-15 NOTE DAGR power cable positive lead insulation is ribbed. 33-24. Attach shrink tubing (46) and terminal lugs (44) and (50) to PLGR power cable negative lead (49) and DAGR power cable positive lead (47). (Refer to TM 9-2320-280-20 for terminal connector repair.) 33-25. Attach DAGR power cable positive lead (47) to 24V terminal board (52) located on cab enclosure panel (43) with existing nut (45). 33-26. Attach DAGR power cable negative lead (49) to ground strap (51) located on cab enclosure panel (43) with existing nut (45). 33-27. Coil excess positive and negative power leads, place beneath ground strap, and secure with tiedown strap (48). NOTE Ensure all excess antenna cable is inside cab of vehicle. 33-28. Coil excess antenna cable and store under integrated rack using tiedown strap as necessary. (Refer to figure 5-90.) 33-29. Install right-side tunnel insulation. (Refer to TM 9-2320-280-20.) Figure 5-91. 44. TERMINAL LUG – 7728780 – QTY. 1 46. SHRINK TUBING – MS23053/4-302-0 – QTY. A/R 48. TIEDOWN STRAP – MS3367-1-0 – QTY. A/R 50. TERMINAL LUG – 7728777 – QTY. 1 43 44 45 48 45 49 46 50 51 52 46 47 ~