TB-9-2320-280-35-14 HMMWV Technical Bulletin Installation for SINCGARS FBCB2 PLGR EPLRS 150W Radio Download

Page 91 of 148

5-69 TB 9-2320-280-35-14 21. LOOP CLAMP – MS21333-112 – QTY. 3 23. LOOP CLAMP – MS21333-69 – QTY. 3 27. NUT – 9419143 – QTY. 1 29. LOOP CLAMP – MS21333-98 – QTY. 1 30. CAPSCREW – B1821BH025C075N – QTY. 1 Figure 5-90. 25-7. Route SINCGARS antenna cable (11) down B-pillar (19) to cab enclosure panel (24). 25-8. Locate, mark, and drill one 0.281-in. hole (28) in right overhead rail (20). 25-9. Secure right-side SINCGARS antenna cable (11) to right overhead rail (20) with clamp (29), screw (30), and nut (27). NOTE Clamps will be large to accommodate speaker cables installed later. 25-10. Secure SINCGARS antenna cable (11) to B-pillar (19) with three clamps (21) and existing screws (22). 25-11. Secure SINCGARS antenna cable (11) to cab enclosure panel (24) with three clamps (23) and existing screws (25). 25-12. Route SINCGARS antenna cable (11) under integrated rack (26), up through access hole, and to vicinity of SINCGARS mount. ~ ~ 19 21 22 23 25 20 ~ 26 ~ 20 27 28 29 30 11 ~ 24