TB-9-2320-280-35-13 HMMWV Technical Bulletin Installation for SINCGARS FBCB2 PLGR EPLRS 20W Radio Download

Page 97 of 148

5-69 TB 9-2320-280-35-13 20. LOOP CLAMP – MS21333-112 – QTY. 3 22. LOOP CLAMP – MS21333-69 – QTY. 3 26. NUT – 9419143 – QTY. 1 28. LOOP CLAMP – MS21333-98 – QTY. 1 29. CAPSCREW – B1821BH025C075N – QTY. 1 Figure 5-89. 22-7. Route SINCGARS antenna cable (11) down B-pillar (19) to cab enclosure panel (23). 22-8. Locate, mark, and drill one 0.281-in. hole (27) in right overcab mount (2). 22-9. Secure right-side SINCGARS antenna cable (11) to overcab mount (2) with clamp (28), screw (29), and nut (26). NOTE Clamps will be large to accommodate speaker cables installed in Section XXIX. 22-10. Secure SINCGARS antenna cable to B-pillar (19) with three clamps (20) and existing screws (21). 22-11. Secure SINCGARS antenna cable (11) to cab enclosure panel (23) with three clamps (22) and existing screws (29). 22-12. Route SINCGARS antenna cable (11) under integrated rack (25), up through access hole, and to vicinity of SINCGARS mount. ~ ~ 19 20 21 22 24 2 ~ 25 ~ 2 26 27 28 29 11 ~ 23