TB-9-2320-280-35-13 HMMWV Technical Bulletin Installation for SINCGARS FBCB2 PLGR EPLRS 20W Radio Download

Page 90 of 148

5-62 TB 9-2320-280-35-13 Figure 5-82. Section XXI. EPLRS CABLES INSTALLATION (TWO-MAN VEHICLES) NOTE Loosen right-side tunnel insulation before performing step 21-1. (Refer to TM 9-2320-280-20.) Perform following procedures for two-man vehicle configuration only. 21-1. Route power cable (15) under right-side tunnel insulation towards terminal board. (Refer to figure 5-81.) 21-2. Attach heat shrink tubing (3) and two terminal lugs (1) and (8) to power cable negative lead (7) and power cable positive lead (4). (Refer to TM 9-2320-280-20 for terminal connector repair.) 21-3. Connect power cable positive lead (4) to 24V terminal board (10) located on cab enclosure panel (11) with existing nut (2). 21-4. Connect power cable negative lead (7) to ground strap (9) located on cab enclosure panel (11) with existing nut (6). Secure leads together with tiedown strap (5). 21-5. Secure right-side tunnel insulation. (Refer to TM 9-2320-280-20.) 1. TERMINAL LUG – 7728780 – QTY. 1 3. SHRINK TUBING – MS23053/4-302-0 – QTY. A/R 5. TIEDOWN STRAP – MS3367-1-0 – QTY. A/R 8. TERMINAL LUG – 7728777 – QTY. 1 11 1 2 5 3 4 ~ 6 7 3 8 9 10