TB-9-2320-280-35-12 HMMWV Technical Bulletin Installation for EPLRS Network Manager Download

Page 42 of 162

TB 9-2320-280-35-12 5-14 Section VII. PLGR BRACKET INSTALLATION 7-1. Install PLGR bracket (11) on integrated rack (1) with four screws (12). 7-2. Locate, mark, and drill one 0.201-in. diameter hole (9) in right-side engine tunnel (10). 7-3. Remove paint from vicinity of hole (8) on integrated rack (1) and hole (9) on right-side engine tunnel (10). Apply anti-seize compound as required. 7-4. Fabricate ground strap (5) from 8.00-in. length of braided wire and two terminal lugs. 7-5. Install ground strap (5) on integrated rack (1) with capscrew (6), two lockwashers (4), lockwasher (2), and nut (3). 7-6. Install ground strap (5) on right-side engine tunnel (10) with self-tapping screw (7) and two lockwashers (4). Figure 5-19. ~ ~ 1 2 3 5 6 4 7 8 9 10 11 12 4 4 2. LOCKWASHER – MS35338-44 – QTY. 1 3. NUT – 9419143 – QTY. 1 4. LOCKWASHER – MS45904-68 – QTY. 4 5. GROUND STRAP • BRAIDED WIRE – AA59569F30T0375 – QTY. A/R • TERMINAL LUG – MS20659-129 – QTY. 2 6. CAPSCREW – B1821BH025C100N – QTY. 1 7. SELF-TAPPING SCREW – 9426241 – QTY. 1 11. PLGR BRACKET – 986-0645-001 – QTY. 1 12. SCREW – MS35206-263 – QTY. 4