TB-9-2320-280-35-12 HMMWV Technical Bulletin Installation for EPLRS Network Manager Download
Page 36 of 162
TB 9-2320-280-35-12 5-12 1. LOCKWASHER – MS35338-44 – QTY. 3 2. WASHER – 2436161 – QTY. 4 3. CAPSCREW – B1821BH025C100N – QTY. 3 4. CPU ISOLATION KIT – 872826-2 – QTY. 1 6. CPU – 881292-1 – QTY. 1 11. CAPSCREW – B1821BH025C125N – QTY. 1 12. LOCKWASHER – MS45904-68 – QTY. 2 13. CPU GROUND STRAP • BRAIDED WIRE – AA59569F30T0375 – QTY. A/R • TERMINAL LUG – MS20659-141 – QTY. 2 Section VI. FBCB2 COMPONENTS INSTALLATION NOTE SINCGARS model AN/VRC-92F shown. 6-1. Remove paint from vicinity of holes (8) on integrated rack (7) and on both sides from vicinity of corresponding holes (10) on CPU isolation kit (4). Apply anti-seize compound as required. 6-2. Install CPU isolation kit (4) on integrated rack (7) with three capscrews (3), washers (2), and lockwashers (1), leaving open holes (8) and (10). 6-3. Install keyboard (9) in keyboard slot of integrated rack (7). 6-4. Install CPU (6) on CPU isolation kit (4) with two existing fastener guards (5). 6-5. Fabricate ground strap (13) from 8.00-in. length of braided wire and two terminal lugs. 6-6. Install ground strap (13) on CPU ground stud (17) with existing washer (14), lockwasher (15), and wingnut (16). 6-7. Install ground strap (13) on CPU isolation kit (4) and integrated rack (7), with capscrew (11), washer (2), and two lockwashers (12). 1 2 3 4 5 5 6 6 4 10 10 11 2 13 10 14 15 16 17 7 12 Figure 5-17. 8 9 Change 1