TB-9-2320-280-35-12 HMMWV Technical Bulletin Installation for EPLRS Network Manager Download
Page 100 of 162
TB 9-2320-280-35-12 5-72 Section XXXV. COMPUTER STAND TUNNEL CABLE INSTALLATION 35-1. Route Ethernet cable (3) from front cable carrier (5), along computer stand (4) lower shelf. 35-2. Secure Ethernet cable (3), to computer stand (4) lower shelf with three clamps (1), and locknuts (2). 35-3. Route DC-DC cable (7) from rear cable carrier (6), to DC-DC adapter (8). 35-4. Route Parallel cable (10) and PCMCIA cable (9) from rear cable carrier (6), along computer stand (4) lower shelf. 35-5. Secure Parallel cable (10) and PCMCIA cable (9), to computer stand (4) lower shelf with three clamps (11), and locknuts (2). 35-6. Locate, mark, and drill four 0.147-in. diameter holes (13) in cargo floor (14). 35-7. Route Ethernet cable (3), from computer stand (4) lower shelf along cargo floor (14) to KOK-13 support leg (18). 35-8. Route Parallel cable (10) and PCMCIA cable (9), from computer stand (4) lower shelf along cargo floor (14) to KOK-13 support leg (18). 35-9. Secure Ethernet cable (3), to cargo floor (14) with four clamps (1) and self-tapping screws (12). 35-10. Secure Parallel cable (10) and PCMCIA cable (9), to cargo floor (14) with two clamps (11) and existing self-tapping screws (12). 35-11. Secure Ethernet cable (3), to KOK-13 support leg (18) with clamp (1), screw (17), lockwasher (16), and locknut (15). 35-12. Secure Parallel cable (10) and PCMCIA cable (9), to KOK-13 support leg (18) with clamp (11), existing screw (17), lockwasher (16), and locknut (15). ~ 1 2 3 4 5 6 7 8 9 10 2 11 1. LOOP CLAMP – MS21333-69 – QTY. 3 2. NUT – MS51967-5 – QTY. 6 11. LOOP CLAMP – MS21333-75 – QTY. 3 Figure 5-103.