MWO-9-2320-280-35-2 HMMWV 3-Point Seatbelt Restraint System Download

Page 28 of 116

MWO 9-2320-280-35-2 Change 2 23 (5) Using tape as a template, transfer rivet head locations by center punching tape on reinforcement and remove tape as shown in figure 43. NOTE Upon completion of all drilling, remove any sharp edges and burrs. (6) Using marked locations on reinforcement, drill 0.406-inch diameter clearance hole for rivet heads as shown in figure 43. (7) Locate, mark, and drill seven 0.125-inch diameter holes in reinforcement as shown in figure 10. (8) Aline centerline on reinforcement to centerline on right side body and "B" pillar. Using right side body and "B" pillar as a template, locate and mark screw hole as shown in figure 44. (9) Aline centerline on reinforcement to centerline on right side body and "B" pillar. Using reinforcement as a template, drill seven 0.191-inch diameter holes through reinforcement and in right side body as shown in figure 45. (10) Drill 0.281-inch diameter hole in reinforcement marked in step (8) as shown in figure 44. (11) Apply 00206 part 1 activator to right side body and "B" pillar as shown in figure 12. (12) Apply 00206 part 2 adhesive to mating surface of reinforcement as shown in figure 13. (13) Install reinforcement to right side body and "B" pillar and secure with seven NAS9301BNS-6-03 rivets as shown in figure 45. (14) Position existing screw and two washers removed in step (2) in reinforcement and right side body. Secure screw with M45913/4-4CG8Z nut as shown in figure 45. (15) Drill three 0.191-inch diameter holes through reinforcement and right side body as shown in figure 45. (16) Using holes in bottom of reinforcement, install three NAS9301BNS-6-03 rivets through reinforcement and left side body as shown in figure 45. f. LEFT TUNNEL REINFORCEMENT ASSEMBLY INSTALLATION. (1) Remove screw, retainer, and insulation from left side tunnel as shown in figure 19. (2) Remove rivet on left tunnel as shown in figure 19. (3) Position 12342723 template to left side tunnel and drill three 0.125-inch diameter holes as shown in figure 20. (4) Enlarge hole drilled in step (3) to 0.468-inch diameter in left side tunnel as shown in figure 21. NOTE Ensure that release button on the buckle is positioned towards tunnel. (5) Position 12342386 reinforcement assembly to left side tunnel and secure with 12341856 washer, buckle (part of seatbelt assembly 12342377-1), and 12340259-3 bolt as shown in figure 21. Tighten bolt to 35-40 lb-ft (48-54 N m). (6) Enlarge two holes drilled in step (3) to 0.191-inch diameter through left side tunnel and reinforcement assembly as shown in figure 21. (7) Install two NAS9301BNS-6-03 rivets through holes in left side tunnel and reinforcement assembly as shown in figure 21.